Truckee River Stabilization and Restoration Project (Lake or Streambed Alteration Agreement No. 1600-2016-0002-R2)

Summary

SCH Number
2016048226
Public Agency
California Department of Fish and Wildlife, Region 2 (CDFW)
Document Title
Truckee River Stabilization and Restoration Project (Lake or Streambed Alteration Agreement No. 1600-2016-0002-R2)
Document Type
NOE - Notice of Exemption
Received
Posted
4/18/2016
Document Description
The project is limited to streambank stabilization and habitat restoration and enhancement in the floodplain from the edge of existing bike trail to theTruckee River. Each site will include the installation of boulders in the river to serve as fish habitat and to provide a resting place for rafters, and improvements to pedestrian access to reduce overland impact to the bank of the river. No trees will be removed as part of this project.

Contact Information

Name
Kyle Stoner
Agency Name
California Department of Fish and Wildlife, Region 2
Contact Types
Lead/Public Agency

Location

Other Location Info
The project is located in and adjacent to the Truckee River at four (4) locations in Sections 2, 3, and 12. Township 15 North, Range 16 East, USGS 705 Minute Quad Map Tahoe City, MDB & M.

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15333
Reasons for Exemption
This project involves river bank stabilization and revegetation to improve habitat, and reduce erosion and sedimentation in the river. The project is less than 5 acres in size.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print