Culvert Replacement at Unnamed Tributary to Olema Creek (Lake or Streambed Alteration Agreement no. 1600-2017-0019-R3)
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016042073
- Lead Agency
- California Department of Transportation, District 4
- Document Title
- Culvert Replacement at Unnamed Tributary to Olema Creek (Lake or Streambed Alteration Agreement no. 1600-2017-0019-R3)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/5/2017
- Document Description
- CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0019-R3, pursuant to section 1602 of the Fish and Game Code to the Caltrans as represented by Jo Ann Cullom. The Project is limited to the replacement of two failing 24 inch culverts with a 30 foot long cast in place, reinforced concrete, single-span bridge along with a midway guardrail and permanent wildlife friendly exclusionary fencing. An 80 foot temporary bridge shall be created as the old bridge is removed and new bridge is constructed.
- Contact Information
-
Robert Stanley
CDFW
Lead/Public Agency
7329 Silverado Trail
Napa, CA 94558
Phone : (707) 944-5529
Location
- Coordinates
- 38°01'7.68"N 122°46'17.2"W
- Counties
- Marin
- Cross Streets
- SR 1, 3 mi south of Bear Valley Rd intersection
- Total Acres
- 0.77
- Parcel #
- 166-060-41, -070-22
- State Highways
- 1
- Waterways
- Olema Creek
- Other Location Info
- Olema
Notice of Determination
- Approving Agency
- CDFW
- Approved On
- Final Environmental Document Available at
- 7329 Silverado Trail, Napa, CA 94558
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.