Franklin Electric Transmission Project

4 Documents in Project

Summary

SCH Number
2016042050
Lead Agency
Sacramento Municipal Utility District
Document Title
Franklin Electric Transmission Project
Document Type
NOD - Notice of Determination
Received
Posted
10/25/2016
Present Land Use
Substation site: present land use- ag Z:AG-80 GPD:Ag
Document Description
The project consists of constructing and operating a new bulk transmission substation (Franklin Bulk substation) that would receive 230kV and step it down to 69kV, constructing and operating a new co-located distribution substation (Franklin Distribution substation) that would receive 69kV and step it down to 12kV, and modifying existing and constructing new overhead 69kV and 230kV power lines that would link the substations to the existing electrical grid.

Contact Information

Name
Kim Crawford
Agency Name
Sacramento Municipal Utility District
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Franklin Blvd/Hood Franklin Rd, and Franklin Blvd from Elk Grove and Lambert Rd
Zip
95757
Total Acres
17
Parcel #
132-0132-029. -044
State Highways
I-5
Railways
Western Pacific Railroad
Airports
Flying B Ranch
Schools
ES
Waterways
Stone Lake, Snodgrass Slough, Irrigation Basins, emergency

Notice of Determination

Approving Agency
Sacramento Municipal Utility District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.