Ione Road Bridge Replacement over Buckeye Creek

3 Documents in Project

Summary

SCH Number
2016042038
Lead Agency
Sacramento County
Document Title
Ione Road Bridge Replacement over Buckeye Creek
Document Type
NEG - Negative Declaration
Received
Present Land Use
Ag/AG80/Gen Ag
Document Description
The proposed project consists of the replacement of the existing bridge on Ione Road over Buckeye Creek (Bridge No. 24C-250). The project will replace the existing structurally deficient bridge with a new structure. The existing single span concrete deck slab with steel stringers was built in 1950 and is 62 ft long and 28 ft wide. The existing roadway is two lanes with little to no shoulder and does not meet current American Association of State HWY and Transportation Officials (AASHTO) standards. The proposed replacement bridge will be a single span precast, pre stressed wide flange girder bridge on seat abutments with 12 in "H" piles. The replacement bridge will provide two 12 ft traffic lanes with six foot paved shoulders and barrier rail on both sides for a total of 40 ft. The shoulders will provide for future Class II Bikeways, consistent with the Sacramento County's Bikeway Master Plan. The proposed scope of work for this project includes: bridge demolition, channel slope protection, roadway approach work, and bridge construction. The total length of the project is expected to be approximately 500 ft, which includes a new 80-ft long bridge with approximately 200 ft of roadway approach work on each side of the bridge. Special construction techniques include the construction of a retaining wall on the southwest side of the bridge. In addition, rock slope protection and fill will be placed on the southeast bank to repair and prevent further erosion.

Contact Information

Name
Catherine Hack
Agency Name
Sacramento County
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Cross Streets
Meiss Rd/Ione Rd
Total Acres
0.5
State Highways
16,124
Waterways
Buckeye Creek
Township
7n
Range
8e
Section
25
Base
MtDiablo
Other Location Info
Ione

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Transportation Projects, California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), Department of Toxic Substances Control, Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Water Quality, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Transportation:Other (bridge replacement)
Local Actions
Bridge replacement
Project Issues
Air Quality, Cultural Resources, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print