Placer Center Kitchen/Dining Hall/Multipurpose Room and Dormitory Replacement

2 Documents in Project

Summary

SCH Number
2016042029
Lead Agency
California Conservation Corps
Document Title
Placer Center Kitchen/Dining Hall/Multipurpose Room and Dormitory Replacement
Document Type
NOD - Notice of Determination
Received
Posted
6/9/2016
Present Land Use
Z: farm uses, GPD: Rural estate

Document Description
The Placer Center Kitchen/Dining Hall/Mutipurpose Room and Dormitory Replacement (proposed project) would be constructed as part of the California Conservation Corps effort to meet current program requirements at its Placer Center and to replace aging and inadequate facilities. The proposed project would involve the demolition of the existing kitchen/dining hall and men's/women's dormitory buildings and construction of two new replacement structures; demolition of an existing handball court; replacement of the existing Placer Center parking area; construction of an outdoor basketball court and a patio area; installation of an array of photovoltaic panels and other site amenities; and related site work.

Contact Information
Steven J. Fultz
California Conservation Corps
1719 24th St
Sacramento, CA 95816

Phone : (916) 341-3242

Location

Coordinates
38°59'24.5"N 121°4'22.8"W
Cities
Auburn
Counties
Placer
Cross Streets
Christian Valley rd, Iron Mine Rd
Zip
95602
Total Acres
4
Parcel #
075-140-002-000,-008-000
State Highways
49
Waterways
Orr Creek, Dry Creek, Bear River, Combie Aqueduct
Township
13N
Range
8E
Section
10
Base
MtDiablo

Notice of Determination

Approving Agency
California Conservation Corps
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
1719 24th Street, Sacramento, CA 95816

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.