Greenstone Road at Slate Creek Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2018-0093-R2)

3 Documents in Project

Summary

SCH Number
2016042006
Lead Agency
El Dorado County
Document Title
Greenstone Road at Slate Creek Bridge Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2018-0093-R2)
Document Type
NOD - Notice of Determination
Received
Posted
10/22/2018
Present Land Use
Low Density Residential land use surrounding road right of way; limited ag and residential estate zones
Document Description
CDFW has executed Lake and Streambed Alteration AGreement number 1600-2018-0093-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, the El Dorado County Community Development Agency, Transportation Division. The project consists of replacing the existing Greenstone Road over Slate Creek Bridge with a new bridge and realigning and widening portions of Greenstone Road approaching the bridge from the north and south. An underground waterline to the east of Greenstone Road will also be relocated to follow the modified roadway. The new bridge will be standard two-lane bridge, approx. 34 feet wide and 34 feet long, with a 11 foot wide lanes and 4 foot wide shoulders on each side. The relaigned portion of Greenstone Road wil be shifted slightly to the east to straighten a curve just north of the bridge, and new bridge will be accordingly located east of the existing bridge.

Contact Information

Name
Gabriele Quillman
Agency Name
CDFW, North Central Region
Contact Types
Lead/Public Agency

Location

Cities
Placerville
Counties
El Dorado
Cross Streets
Greenstone Rd and Mother Lode Dr
Total Acres
3.4
State Highways
50
Waterways
Slate Creek
Township
10N
Range
10E
Section
33
Base
MDBM
Other Information
Shingle Springs, CA

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print