Project Jupiter Distribution Warehouse, Site Plan Review No. 2015-01
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016041058
- Lead Agency
- City of Apple Valley
- Document Title
- Project Jupiter Distribution Warehouse, Site Plan Review No. 2015-01
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/29/2016
- Present Land Use
- Currently vacant. Z and GPD: Specific plan (adopted North Valley Apple Valley Industrial Specific Plan)
- Document Description
- The proposed 106.5 acre parcel to accommodate a 1,360,875 sq. ft. distribution center and associated ancillary facilities. The distribution warehouse will consist of a single, 45 foot high building consisting of primarily of warehouse space. Ancillary office space, including administration, shipping and receiving offices, are included in the building envelop. Separate guard house (510 sq. ft.) and fire pump house (1,080 sq. ft.) building are proposed on the east side of the site, at the project entrance. Parking areas, located on the east and south sides of the site. The site plan has also been designed to include storm water retention facilities on the west side of the site. Project also includes off-site improvements. These include roadway improvements to Navajo Road, Lafayette Street, and Dachshund Avenue; water main relocation and extensions on the frontage roadways; and undergrounding of power lines on Navajo Road. The proposed project occurs within the boundary of the North Apple Valley Industrial Specific Plan, which was adopted by the Town in Oct. of 2006. At that time, the town also certified an EIR for the entire Specific Plan. The Town has then prepared a subsequent MND/IS for the Project Jupiter Distribution Warehouse project, which tiers off of the Specific Plan EIR (SCH#2006031112). This EIR was prepared to review the environmental constraints and opportunities associated with imposing mitigation measures, the EIR was designed to be used as an information database to facilitate the streamlining, or tiering of the environmental review process for subsequent projects proposed within the Specific Plan boundary.
- Contact Information
-
Carol Miller
City of Apple Valley
Lead/Public Agency
14955 Dale Evans Parkway
Apple Valley, CA 92307
Phone : (760) 240-7000 ext 7222
Location
- Coordinates
- 34°35'31"N 117°11'30"W
- Cities
- Apple Valley
- Counties
- San Bernardino
- Cross Streets
- Navajo Rd and Lafayette St
- Zip
- 92307
- Total Acres
- 106.5
- Parcel #
- 046-323-107, -108, -110, -160; 046-323-126, -127, -128; 046-323-142, -143
- Airports
- Apple Valley
- Township
- 6N
- Range
- 3W
- Section
- 21
- Base
- SBBM
Notice of Determination
- Approving Agency
- Town of Apple Valley Planning Division
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 14955 Dale Evans Parkway, Apple Valley, CA 92307
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.