Addendum No. 1 tot he Fontana Water Company Recycled Water Improvement Project

5 Documents in Project

Summary

SCH Number
2016041051
Lead Agency
Inland Empire Utilities Agency
Document Title
Addendum No. 1 tot he Fontana Water Company Recycled Water Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/20/2017
Document Description
San Gabriel Valley Water Company is a privately owned water company that provides water service to customers located within its Fontana Water Company division service area, which includes the City of Fontana and some unincorporated areas in the immediate vicinity. The FWC provides this water service pursuant to the regulatory jurisdiction of the Public Utilities Commission of the State of CA (CPUC). As a public utility water company, FWC is mandated to provide its customers a reliable supply of water that complies with state and federal safe drinking water standards. As a non-governmental entity SFVWC is not subject to CEQA unless its actions involve governmental participation, financing, discretionary permitting or approval. IEUA has agreed to serve as the CEQA lead agency for this project as it will deliver IEUA recycled water to FWC that will be used to offset existing potable water demand within FWC's service area. The proposed project includes the expanded delivery of recycled water produced by IEUA Water Reclamation Facilities to FWC at its Regional Plant No. 3 recharge basin location. FWC proposes to install a reservoir, pump station, and recycled water delivery pipelines; most of the proposed pipelines have already been installed, though some yard piping is needed. The purpose of the proposed RP-3 improvements is to increase the Agency's program to max the beneficial reuse of recycled water to reduce dependence on imported water to replace use of potable water for landscape irrigation by using recycled water. Prior to adopting the MND for the FWC Recycled Water Improvement Project, FWC notified IEUA that it was making minor modifications to the project. Specifically, a second reservoir (0.53 million gallons of storage), possible 4,000 gallon hydropneumatic tank and additional piping have been added to the project. Based on this project modification, a decision was made to recirculate the Initial Study to address this site modification at IEUA's RP-3 location. This addendum is being prepared in response to FWC's need to revise the location of the facilities planned within RP-3. Additionally, FWC seeks to reduce the number of reservoirs from two reservoirs to one 0.53 MG reservoir, and will enclose the booster pump station to attenuate noise. The proposed project modifications are in response to IEUA's plans to utilize the land upon which the project facilities were originally planned to be constructed. The reduction in reservoirs from two reservoirs to one is a response to the lack of need for an additional reservoir at this time, and the addition of the booster pump system enclosure is due to the need to attenuate noise because of the closer proximity to the habitat conservation basin and adjacent residences. The proposed project includes the expanded delivery of recycled water produced by IEUA Water Reclamation Facilities to FWC at its Regional Plan No. 3 (RP-3) recharge basin location. FWC proposes to install on reservoir, pump station that may include a 4,000 gallon hydropneumatic tank (and 10 horsepower pump to fill the tank) with an enclosure, and recycled water delivery pipelines; most of the proposed pipelines have already been installed, through some yard piping is needed. The purpose of the proposed RP-3 improvements is to increase the Agency's program to maximize the beneficial reuse of recycled water to reduce dependence on imported water and to replace use of potable water for landscape irrigation by using recycled water.

Contact Information

Name
Liza Munoz
Agency Name
Inland Empire Utility Agency
Contact Types
Lead/Public Agency

Location

Cities
Fontana
Counties
San Bernardino
Cross Streets
Jurupa Ave/Beech Ave
Total Acres
20
State Highways
I-10
Waterways
DeClez Channel
Township
1S
Range
6W
Section
35
Base
SBBM
Other Information
lat: 71"

Notice of Determination

Approving Agency
Inland Empire Utilties Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print