CNG Fueling Infrastructure

3 Documents in Project

Summary

SCH Number
2016041036
Lead Agency
Fullerton Joint Union High School District
Document Title
CNG Fueling Infrastructure
Document Type
NOD - Notice of Determination
Received
Posted
11/1/2016
Present Land Use
District M&O and Transportation Center/M-1 Light Manufacturing/Light Industrial (0.8 FAR)
Document Description
FJUHSD's proposed project upgrades, relocates, and expands the existing CNG refueling facility the District's Transportation Center (DTC or CNG Site). Main construction components include: 1) relocation of current CNG compressor/equipment from the southwest corner to the northeast corner of the site secured by the installation of a six-foot high chain-link fence (with gates) around the equipment; 2) expansion of the facility by installing 15 new time-fill posts with 2 dispensers (hoses) per post, totaling 30 new dispensers; 3) installing a new public vending fast-fill post with 2 dispensers available 24/7 with an automated payment system) constructed under an 18-foot canopy.

Contact Information

Name
Eric VanWinkle
Agency Name
CA Energy Commission
Contact Types
Lead/Public Agency

Location

Cities
La Habra
Counties
Orange
Cross Streets
S. Leslie St and Imperial Hwy
Zip
90631
Total Acres
3.83
Parcel #
019-111-66, -78, -35
Railways
Union Pacific
Schools
Las Romas ES
Township
3S
Range
10W
Section
9
Base
San Ber

Notice of Determination

Approving Agency
CA Energy Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print