Plant 211 Groundwater Supply Well Project Conditional Use Permit No. CUP 13-001 and Development Review Project No. 12-020
3 Documents in Project
Summary
SCH Number
2016041015
Lead Agency
City of Whittier
Document Title
Plant 211 Groundwater Supply Well Project Conditional Use Permit No. CUP 13-001 and Development Review Project No. 12-020
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
The project site is vacant. The General Plan designation is low density residential. The zoning classification is single family residential
Document Description
CUP 13-001 will permit the use of a public utility facilities and utilities by mutual companies, except and public facility for which a building permit is not required pursuant to the city's building regulations, and such facility which is permitted by city granted franchise consistent with Whittier Municipal Code Section 18.52.030A. Development Review Application No. DRP 12-020 will allow for the review and approval of the site plan, floor plans and elevation associated with the utility facility. A two-phased project consisting of the following actions is proposed for the First Ave location: Phase 1 involves the drilling, development and testing of an exploratory groundwater supply well to assess the feasibility of drilling a new permanent potable water supply well at Suburban's Plant 211 site. The test well will demonstrate the groundwater yield and water quality in the underground aquifer. If the test well satisfactorily meets water quality requirements and yield thresholds. Phase 2 would be initiated. Phase 2 would result in the drilling of a new groundwater production well to serve customers in the Whittier/La Mirada portion of Suburban's service area, the construction of a new 600 sf single story pump structure housing the facility's 300-horsepower pump, and electrical and mechanical equipment and the construction of ancillary piping to existing structures in First Ave.
Contact Information
Name
Luis G. Escobedo
Agency Name
City of Whittier
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Whittier
Counties
Los Angeles
Cross Streets
First Ave and Rushford St
Zip
90603
Total Acres
0.24
Parcel #
8231-036-001, -002
State Highways
72
Schools
Jordan ES
Township
3S
Range
11W
Section
1
Base
SB
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 7 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Water Facilities (Type Exploratory Well)
Local Actions
Site Plan, Use Permit
Project Issues
Hydrology/Water Quality, Noise
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.