Prado Basin Ecosystem Restoration and Water Conservation Integrated Feasibility Study

3 Documents in Project

Summary

SCH Number
2016041002
Lead Agency
Orange County Water District
Document Title
Prado Basin Ecosystem Restoration and Water Conservation Integrated Feasibility Study
Document Type
NOD - Notice of Determination
Received
Posted
5/26/2021
Document Description
The Orange County Water District approved the Prado Basin Ecosystem Restoration and Water Conservation Integrated Feasibility Study. There are two components for the project, ecosystem restoration and water conservation. The Water Conservation Plan would increase the current allowable temporary storage for water conservation to a greater volume behind Prado Dam and would reduce the flow release from Prado Dam during flood seasons. This would assist OCWD to reduce potential overdraft, reduce reliance on imported water and increase the local water supplies. Implementation of the water conservation measure would result in a slight regulation modification to accommodate a slightly higher temporary pool impoundment during the fall and winter flood season, which would be released at a rate that is optimal for groundwater recharge of aquifers associated with downstream reaches of the Santa Ana River. It does not compete with flood risk management objectives of the Santa Ana River Mainstem project. The EIR, including the MMRP, was certified on May 19, 2021 pursuant to certain findings of fact in accordance with all applicable CEQA requirements.

Contact Information

Name
Shawn Nevill
Agency Name
Orange County Water District
Contact Types
Lead/Public Agency / Project Applicant

Location

Counties
Orange, Riverside
Regions
Unincorporated
Cross Streets
N/A
Zip
92880
Total Acres
Approx 700
Parcel #
N/A
State Highways
SR 71, SR 91
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
Santa Ana River, Chino Creek, Mill Creek
Other Location Info
Prado Basin

Notice of Determination

Approving Agency
Orange County Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
18700 Ward Street, Fountain Valley, CA 92708

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print