Travel Time Savings (TTS) and Track Maintenance Project

Summary

SCH Number
2016038463
Public Agency
Capitol Corridor Joint Powers Authority
Document Title
Travel Time Savings (TTS) and Track Maintenance Project
Document Type
NOE - Notice of Exemption
Received
Posted
3/30/2016
Document Description
Rail replacement, track tamping, signal work to improve reliability and, for travel time savings, reduce the running time for Capitol Corridor service. Beneficiaries are Capitol Corridor, San Joaquin, and ACE passenger rail and UPRR freight trail. Purposes are to maintain on-time performance and reduce travel time.

Contact Information

Name
James Allison
Agency Name
Capitol Corridor Joint Powers Authority
Contact Types
Lead/Public Agency

Location


Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15301
Reasons for Exemption
The project is both part of maintenance and direct in-kind replacement of track infrastructure along the corridor.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print