Operation of Gallo Winery Well #10

Summary

SCH Number
2016038156
Public Agency
State Water Resources Control Board
Document Title
Operation of Gallo Winery Well #10
Document Type
NOE - Notice of Exemption
Received
Posted
3/10/2016
Document Description
The State Water Resources Control Board (SWRCB) as the lead agency will be issuing a water supply permit. E & J Gallo Winery initially graded the project site in July 2015 and drilled a 240 foot well that produces 1,000 gpm that August. The pump pedestal and 100 HP pump was installed in November 2015. They finished the final grading of the site in December, and a 20 foot by 20 foot concrete pad was then put in place. They also installed 6-10 inch piping 15 feet long above ground, and 10 inch diameter C900 (NSF) 500 feet long piping below ground that connected to their existing water collection system. These construction components were completed in January 2016, along with the installation of the security fence. The project will provide for the operation of the constructed Gallo Winery Well and infrastructure.

Contact Information

Name
Kassy Chauhan
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Counties
Merced

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15301 C:1
Reasons for Exemption
The project consists of the operation of existing facilities involving no expansion of use beyond that existing at the time of the lead agency's determination. Pursuant to the California Fish and Wildlife Code, Section 711.4(d)(1), the CDFW environmental review filing fees do not apply.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print