Meyers Stream Environmental Zone/Erosion Control Project

3 Documents in Project

Summary

SCH Number
2016032081
Lead Agency
El Dorado County
Document Title
Meyers Stream Environmental Zone/Erosion Control Project
Document Type
NOD - Notice of Determination
Received

Document Description
The Project site is an existing residential development in the community of Meyers in South Lake Tahoe bordered by the Upper Truckee River on the west, Lake Tahoe Golf Course on the northwest, US Hwy 50/SR 89 on the south, and by Pioneer Trail on a small portion on the east (Figure 1). The overall goal of the Project is to design and implement erosion control and water quality improvement measures that will reduce the discharge of sediment and pollutants to Lake Tahoe from county administered right-of-way. The Project will not change the use of the site or surrounding area. The Project will benefit the natural environment with the implementation of the proposed improvements. After Project completion, less sediment will enter Lake Tahoe from the Project area, thereby improving water quality in Lake Tahoe.

Contact Information
Donaldo Palaroan
El Dorado County
924 B Emerald Bay Road
South Lake Tahoe, CA 96150

530-573-7920

Location

Coordinates
38°51'30"N 120°0'56"W
Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
Pioneer Tr, Hopi Ave., Apache Ave., Arapahoe St., Country ClubDr., E San Bernardino Ave.
Zip
96150
Total Acres
328
State Highways
50
Schools
Lake Tahoe Environmental
Waterways
Upper Truckee River

Notice of Determination

Approving Agency
El Dorado County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
924B Emerald Bay Road, South Lake Tahoe, CA 96150

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search