Shadowbrook Lift Station and Force Main Project (Lake or Streambed Alteration Agreement No. 1600-2016-0112-R2)

4 Documents in Project

Summary

SCH Number
2016032076
Lead Agency
City of Roseville
Document Title
Shadowbrook Lift Station and Force Main Project (Lake or Streambed Alteration Agreement No. 1600-2016-0112-R2)
Document Type
NOD - Notice of Determination
Received
Posted
10/26/2016
Present Land Use
Attached Housing (R3) and Floodway (FW)/High Density Residential and Low Density Residential
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0112-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, the City of Roseville as represented by Ed Winston. The project is limited to the rehabilitation of the existing Shadowbrook Lift Station to improve its resiliency to sewer system overflows. The rehabilitation of the existing Shadowbrook Lift Station would be constructed in two phases (Phase 1 and 2). Phase 1 is not covered by the Agreement. Phase 2 consists of construction of the proposed dual six-inch force mains and would require a clearwater diversion to temporarily de-water a segment of Dry Creek and divert flows through the project area. The project would involve installation of a new fiberglass wet well within the existing pump station steel wet well, thereby occupying the same footprint. The new wet well would extend to a point approx. one foot above the 100-year floodplain. The existing masonry enclosure surrounding the pump station would be partially reconfigured to raise the concrete working pad to match the new top of wet well elevation; the existing lift station masonry block walls would also be extended vertically to retain the present eight-foot distance above grade. The footprint for the concrete pad would also be extended to provide a secured area for a permanently mounted on-site standby generator. The expansion area would be immediately adjacent to the existing lift station facility and overlay an area which is currently occupied by a concrete pad. The reconstructed lift station would cover an area of approx. 4,000 sq. ft., which is larger than the existing facility. Additionally, the proposed project includes installation of new dual six-inch force mains to connect from the lift station to the existing 63-inch Dry Creek interceptor sewer line located on the west side of the creek. The purpose of the second force main is to provide system redundancy rather than capacity for future sewage flows (sewer shed is built out). The new dual force mains would be approx. 370 feet in length and would consist of ductile iron pipe with ceramic epoxy lining.

Contact Information

Name
Angela Calderaro
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Roseville
Counties
Placer
Cross Streets
Harding Blvd and Shadow Ridge
Zip
95678
Total Acres
4.47
State Highways
I80
Railways
UP Rail Road
Schools
Roseville HS
Waterways
Dry Creek
Township
11N
Range
6E
Section
35
Base
MDBM

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.