Pasatiempo Shoulder Widening (EA 05-1C670) Project (Project) (Lake or Streambed Alteration Agreement No. 1600-2017-0476-R3)

3 Documents in Project

Summary

SCH Number
2016032043
Lead Agency
Caltrans 6 (Fresno) (California Department of Transportation, District 6)
Document Title
Pasatiempo Shoulder Widening (EA 05-1C670) Project (Project) (Lake or Streambed Alteration Agreement No. 1600-2017-0476-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0476-R3, pursuant to section 1602 of the Fish and Game Code to Caltrans as represented by Karen Holmes. The project is limited to the construction of a 770 linear foot retaining wall that will occur 10 feet from the existing edge of pavement along SR-17 just before the onramp to southbound SR-1. Approx. 60 linear feet of the retaining wall will encroach into the riparian zone along the unnamed tributary to Carbonera Creek. An existing 24 inch corrugated metal pipe (CMP) system that conveys water into the unnamed tributary shall be replaced with a 17.3 foot long, 24-inch reinforced concrete pipe (RCP). Equipment to be employed shall include asphalt paver, backhoe, bobcat, bulldozer, loader, compressor, concrete pump, crane, dump truck, demolition equipment, excavator, flatbed truck, front-end loader, haul truck, paint truck, pile driver, drill rig, pump truck, redi-mix truck, roller compactor and other similar equipment as well as personnel on foot using hand-tools.

Contact Information
Robert Stanley
CDFW
7329 Silverado Trail
Napa, CA 94558

707-944-5529

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
Hwy 17 / Pasatiempo / Hwy 1
State Highways
Hwy 17

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No