Laurel WTP Test Well Project

2 Documents in Project

Summary

SCH Number
2016032041
Lead Agency
Stinson Beach County Water District
Document Title
Laurel WTP Test Well Project
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2016
Present Land Use
Existing Parcel is Developed for Water Treatment Facilities/C-RA-B-3
Document Description
The District's Laurel WTP Test Well Project involves drilling a Test Well (260-feet in depth, with a 12-inch diameter borehole and 6-inch diameter PVC well casing) at its Laurel Water Treatment Site, located at the end of Laurel Avenue in Stinson Beach (no street address exists for the site). The Laurel WTP Test Well will be drilled to provide information on groundwater conditions, and to evaluate the production of capacity of the Test Well, for the purpose of potentially converting the Test Well into a production well, should the groundwater conditions be favorable. Based on information regarding the production capacity of existing wells in the vicinity of the proposed Test Well, it is anticipated that the well may produce up to 25 gallons per minute.

Contact Information

Name
Ed Schmidt
Agency Name
Stinson Beach County Water District
Contact Types
Lead/Public Agency

Location

Counties
Marin
Cross Streets
State Hwy 1
Zip
94970
Total Acres
0.76
Parcel #
195-260-48
State Highways
1
Schools
Stinson Beach School
Waterways
Bolinas Lagoon
Township
1N
Range
7W
Base
MDB&M
Other Location Info
Stinson Beach

Notice of Determination

Approving Agency
Stinson Beach County Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes