County File #LP14-2008: Verizon Wireless Facility at Viano Vineyards Winery

Summary

SCH Number
2016032029
Lead Agency
Contra Costa County
Document Title
County File #LP14-2008: Verizon Wireless Facility at Viano Vineyards Winery
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
LU:winery/Zoning: agricultural Preserve (A-4), General Agricultural (A-2), and cont'd.

Document Description
The applicant seeks approval of a land use permit to allow the construction of a new Verizon Wireless telecommunications facility. The proposed facility consists of the following elements. 480/240v transformer on 9 sq. ft. concrete pad with protective bollards to be located adjacent to equipment area and within the equipment area lease envelope 500-sq. ft. gravel/asphalt parking area 20-foot wide access easement from Morello Avenue to equipment area 10-foot wide access and utility easement from equipment area to monopine tower 5-foot wide utility easement from existing utility pole to parking area and equipment area 5-foot wide coaxial easement from equipment area to monopine tower Underground and overhead utility extensions Improvement of existing dirt access roads to a compacted gravel surface Request for approval of a variance to allow a 0-foot front yard setback (50 feet required) from an access easement for the proposed retaining wall in the equipment area Request for approval of a tree permit to allow work within the dripline of 5 code-protected trees to allow for the proposed trenching and gravel surfacing elements of the project.

Contact Information
Sean Tully
Contra Costa County
30 Muir Road
Martinez, CA 94553

Phone : (925) 674-7800

Location

Coordinates
38°0'14.8"N 122°5'50.7"W
Cities
Martinez
Counties
Contra Costa
Cross Streets
Morello Avneue and Marie Avenue
Zip
94553
Total Acres
60
Parcel #
161-202-002 161-190-001, 002
State Highways
680, 4
Railways
AT&SF
Airports
Buchanan Field
Schools
Martinez Jr. High
Waterways
Vine Hill Creek, Pacheco Creek, Walnut Creek

Notice of Completion

Review Period Start
Review Period End
Development Type
Other (Wireless Telecommunications Facility)
Local Action
Use Permit
Project Issues
Aesthetic/Visual Archaeologic-Historic Geologic/Seismic
Reviewing Agencies
California Air Resources Board California Department of Fish and Wildlife, Bay Delta Region 3 California Department of Parks and Recreation California Department of Transportation, District 4 California Highway Patrol California Native American Heritage Commission California Public Utilities Commission California Regional Water Quality Control Board, San Francisco Bay Region 2 Department of Water Resources Office of Emergency Services, California Resources Agency

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print