Galleria Boulevard/Stanford Ranch Corad/SR 65 Northbound Ramps Improvement Project (03-0H560)

4 Documents in Project

Summary

SCH Number
2016032019
Lead Agency
Caltrans 3 (Marysville) (California Department of Transportation, District 3)
Document Title
Galleria Boulevard/Stanford Ranch Corad/SR 65 Northbound Ramps Improvement Project (03-0H560)
Document Type
NOD - Notice of Determination
Received
Posted
6/28/2016
Present Land Use
Roseville:Community Commercial, Business Professional, Regional Commercial, Rocklin: Retail Commercial

Document Description
Caltrans, in cooperation with the Placer county Transportation Planning Agency, Placer County, and the Cities of Roseville and Rocklin, proposes to improve the Galleria Boulevard/Stanford Ranch Road/State Route 65 northbound ramps to reduce current and future traffic congestion, improve operations and safety, and comply with current Caltrans and local agency design standards. The proposed project would modify the SR 65 NB ramps at the Galleria Blvd./Stanford Ranch Road interchange as well as reconfigure the lanes along Galleria Blvd./Ranch Road.

Contact Information
Adele Pommerenck
Caltrans
703 B Street
Marysville, CA 95901

Phone : (530) 741-4215

Location

Coordinates
38°46'41"N 121°15'57"W
Cities
Rocklin Roseville
Counties
Placer
Cross Streets
Galleria Blvd./Stanford Ranch Road and SR 65
Parcel #
Various
State Highways
I-80, SR 65
Schools
Various
Waterways
Antelope Creek

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
703 B Street, Marysville, CA 95901

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search