DREAM Project – Waterway Crossings (Streambed Alteration Agreement EPIMS Notification No. SJN-16600-R2)

12 Documents in Project

Summary

SCH Number
2016032012
Lead Agency
San Joaquin County
Document Title
DREAM Project – Waterway Crossings (Streambed Alteration Agreement EPIMS Notification No. SJN-16600-R2)
Document Type
NOD - Notice of Determination
Received
Posted
7/2/2021
Document Description
The Demonstration Recharge Extraction and Aquifer Management (DREAM) Project is a water conveyance pipeline installation Project carried out in collaboration between San Joaquin County, North San Joaquin Water Conservation District (NSJWCD), and the East Bay Municipal Utility District (EBMUD). Along its length, the 12-inch diameter pipeline will cross Mosher Creek, Bear Creek, and an unnamed tributary to Bear Creek.

Contact Information

Name
Ian Ralston
Agency Name
Department of Fish and Wildlife
Contact Types
Responsible Agency

Location

Counties
San Joaquin
Regions
Northern California
Township
2/3N
Range
07E
Other Location Info
The first Project site is located on Mosher Creek, approximately 6 miles southeast of the City of Lodi; Latitude 38.055460, Longitude -121.223097; The second Project site is located on Bear Creek; Latitude 38.069901, Longitude -121.227146; The third Project site is located on an unnamed tributary to Bear Creek; Latitude 38.078996, Longitude -121.224293; in the County of San Joaquin, State of California Section 4/28/29/32, Township 02/03N, Range 07E, U.S. Geological Survey (USGS) map Waterloo, Mount Diablo Meridian.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
the office location listed above for the Lead Agency. CDFW’s record of execution of the above Lake and Streambed Alteration Agreement as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print