Amendment to North San Joaquin Water Conservation District South System Pump Station Replacement Project (Streambed Alteration Agreement No. 1600-2017-0014-R2)
13 Documents in Project
Summary
SCH Number
2016032012
Lead Agency
San Joaquin County
Document Title
Amendment to North San Joaquin Water Conservation District South System Pump Station Replacement Project (Streambed Alteration Agreement No. 1600-2017-0014-R2)
Document Type
NOD - Notice of Determination
Received
Posted
7/27/2018
Present Land Use
Agricultural Land Use/Prevailing GP and Zoning is Agricultural
Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2017-0014-R2, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, North San Joaquin Water Conservation District.
Project is limited to an amendment of an existing Agreement (1600-2017-0014-R2) to include:
Additional excavation and grading of an approx. 950 sq. ft. area along the bank of the Mokelumne River and Placement of the excavated material in the western extent of the irrigation intake ditch.
Removal of approx. 2 cubic yards of accumulated sand around the existing fish screen.
Contact Information
Name
Kyle Stoner
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Lodi
Counties
San Joaquin
Cross Streets
SR 12 and Pixley Slough
Zip
95253
State Highways
SR 12, 88
Waterways
Mokelumne River, Pixley Slough, Bear Crek
Township
3N
Range
7E
Base
MDBM
Other Location Info
Lockeford
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No