Permit No. 19578 – Demonstration Recharge Extraction & Aquifer Management Project & N San Joaquin Water Conservation Dist S System Improvements: Mosher Creek

12 Documents in Project

Summary

SCH Number
2016032012
Lead Agency
San Joaquin County
Document Title
Permit No. 19578 – Demonstration Recharge Extraction & Aquifer Management Project & N San Joaquin Water Conservation Dist S System Improvements: Mosher Creek
Document Type
NOD - Notice of Determination
Received
Posted
9/17/2021
Document Description
Approval of Permit No. 19578, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To install 12-inch diameter high-density polyethylene pipe (HDPE) 5 feet below the Mosher Slough channel via horizontal directional drilling.

Contact Information

Name
Jennifer Calles
Agency Name
Central Valley Flood Protection Board
Contact Types
Responsible Agency

Location

Counties
San Joaquin
Regions
Northern California
Other Location Info
The project is located approximately 0.3 mile southeast of the intersection of East 8 Mile Road and Hildreth Lane, and approximately 0.4 miles downstream of the Moser Slough crossing over East 8 Mile Road, northeast of the City of Stockton, in San Joaquin County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
This Mitigated Negative Declaration, prepared by the lead agency for the project, is available to the general public at the lead agency’s office listed above. The Central Valley Flood Protection Board's administrative record related to the encroachment permit is available for public review at Central Valley Flood Protection Board’s office. Please note, the signed NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print