Operation of Graden Acres Mutual Water Company, Addition of 120,000 Gallon Tank

4 Documents in Project

Summary

SCH Number
2016031082
Lead Agency
Ventura County
Document Title
Operation of Graden Acres Mutual Water Company, Addition of 120,000 Gallon Tank
Document Type
NOD - Notice of Determination
Received

Document Description
SWRCB, as the responsible agency, will be issuing a water supply permit. Garden Acres Mutual Water Company proposed project included construction of water storage and transmission facilities with the following components: 120,000 gallon storage tank approx. 42 feet diameter and 17 feet above existing grade, Gravel access road from Friedrich Road to the tank, Eight foot high chain link fence topped with barbed wire, Approx. 475 sq. ft. of landscape screening, Emergency interconnection for back-up service, 10-inch diameter 325 LF water transmission pipeline, A vegetated retention basin to allow water percolation, Removal of a masonry wall and two non-protected trees, Grading and excavation of approx. 8,500 sq. ft.

Contact Information
Jeff Densmore
SWRCB
1180 Eugenia Place, Suite 200
Carpinteria, CA 93013

805-566-1326

Location

Coordinates
34°13'38.53"N 119°7'46.69"W
Cities
Oxnard
Counties
Ventura
Cross Streets
Friedrich Road between Nyeland Ave and Orange Drive
Zip
93036
Total Acres
.37
Parcel #
149-0-041-205 and 149-0-041-185
State Highways
101
Airports
Camarillo Airport
Schools
Rio Del Valle Jr. High

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1180 Eugenia Place, Suite 200, Carpinteria, CA 93013

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes