Akin Water Company Water Supply Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016031045
- Lead Agency
- State Water Resources Control Board
- Document Title
- Akin Water Company Water Supply Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/16/2016
- Present Land Use
- Site A: Low Density Residential and PS (Public and Semi-Public) Site B: LDR and RS-2 (Low Density Residential)
- Document Description
- The proposed project includes the construction of a new well to serve the City of Porterville, the construction of new distribution pipelines, the abandonment of two existing wells, and the consolidation of the Akin Water Company into the City of Porterville Water System. The new well, located on city-owned property, will be 16 inches in diameter, 710 feet deep, and provide up to 2,000 gallons per minute (gpm) capacity. The proposed distribution pipelines will connect into the existing City of Porterville water system in various locations within the city limits of Porterville.
- Contact Information
-
Carol E. Atkins
State Water Resources Control Board
Lead/Public Agency
1001 I Street
Sacramento, CA 95814
Phone : (916) 341-5460
Location
- Cities
- Porterville
- Counties
- Tulare
- Cross Streets
- Redacted
- Total Acres
- 2
- Parcel #
- Redacted
- State Highways
- 65 and 190
- Schools
- Porterville College
- Waterways
- Porter Slough
- Township
- 22/21S
- Range
- 27E
- Section
- 1/20
- Base
- MDBM
Notice of Determination
- Approving Agency
- State Water Quality Control Board
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 291 N Maint St., Porterville, CA 93257
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.