Winding Way Bridge Replacement (Lake or Streambed Alteration Agreeemnt No. 1600-2016-0236-R2)
2 Documents in Project
Summary
SCH Number
2016022031
Lead Agency
Sacramento County
Document Title
Winding Way Bridge Replacement (Lake or Streambed Alteration Agreeemnt No. 1600-2016-0236-R2)
Document Type
NOD - Notice of Determination
Received
Posted
4/28/2017
Present Land Use
Residential (RD-2), Agricultural - Residential (AR-1)
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0236-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, County of Sacramento.
Project is limited to the replacement the Winding Way Bridge over Chicago Creek. The existing reinforced concrete slab bridge, at 123 feet long and forty (40) feet wide, will be demolished. The new bridge will be 131.5 foot long and has been designed to clear span the ravine so that no in water work will occur. The vertical and horizontal curves of the approaches will be smoothed and widened up to three feet on the north and south sides of the roadway to create continuous Class II bicycle lanes. The new bridge will include two 11.5 foot traffic lanes with 6-foot paved shoulders that include bicycle lanes, for a total width of 39 feet.
Construction staging will occur within the roadway. The existing bridge will be removed from above using cranes. The old footings will remain in place below grade, but will be saw-cut to ground level. Construction is expected to be completed in one season.
Contact Information
Name
Tanya Sheya
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Counties
Sacramento
Waterways
Chicago Creek
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.