Tahoe Lake Elementary School Modernization (Lake or Streambed Alteration Agreement No. 1600-2015-0294-R2)
2 Documents in Project
Summary
SCH Number
2016022023
Lead Agency
Tahoe Truckee Unified School District
Document Title
Tahoe Lake Elementary School Modernization (Lake or Streambed Alteration Agreement No. 1600-2015-0294-R2)
Document Type
NOD - Notice of Determination
Received
Posted
5/20/2016
Present Land Use
Existing land use - Tahoe City ES facilities, circulation, and parking; Zoning - Public Facilities; GP-Public
Document Description
The project includes the construction of new buildings, building modernization and reconfiguration, upgrades to outdoor facilities, and parking lot reconfiguration. Permanent impacts will occur at an ephemeral drainage downslope of the parking lot, due to expansion of the parking lot. Approx. 0.02 acres of ephemeral drainage will be filled, and a culvert will be installed to allow continuous flow of storm flows through the drainage.
Contact Information
Name
Kyle Stoner
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Placer
Cross Streets
North Lake Blvd. and Grove St.
Zip
96161
Total Acres
7.4
Parcel #
094-101-004-000
State Highways
89
Railways
UPRR
Schools
Tahoe Lake ES
Waterways
Lake Tahoe, Truckee River, Burton Creek
Other Location Info
Tahoe City
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.