Ridgeview 10 Lift Station Removal and Pipeline Installation Project

2 Documents in Project

Summary

SCH Number
2016022020
Lead Agency
El Dorado Irrigation District
Document Title
Ridgeview 10 Lift Station Removal and Pipeline Installation Project
Document Type
NOD - Notice of Determination
Received
Posted
10/12/2016
Present Land Use
Private property within El Dorado Irrigation District public utility easements and public right of way.
Document Description
Project would bypass the Ridgeview 10 Lift station and send all sewer flows via gravity to the nearby Promontory I Lift Station located in the Promontory village 8 development. The first priority of construction would be the installation of an additional pipeline to bypass flows from the Ridgeview 10 Lift Station at the end of Crestline Court in the Ridgeview Village Estates and then connect to an existing pipeline by crossing a section of property owned by the Promontory Village 8 development to the existing Promontory I Lift Station. Along the pipeline alignment an asphalt concrete paved trail would be installed to allow for access by District operations staff and equipment. The district would then completely remove the out-of-service Ridgeview 10 lift station.

Contact Information

Name
Kristin Schaeffer
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Near the Wilson Blvd. and Montridge Way Cross Street
Zip
95762
Total Acres
0.25
Parcel #
124-400-02
State Highways
50
Waterways
Lower American River
Township
9N
Range
8E
Section
3
Base
MDBM
Other Location Info
El Dorado Hills

Notice of Determination

Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.