Capell Creek Bridge Replacement PRoject [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2018-002-03 (ITP)]

6 Documents in Project

Summary

SCH Number
2016022010
Lead Agency
Caltrans 4 (Oakland) (California Department of Transportation, District 4)
Document Title
Capell Creek Bridge Replacement PRoject [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2018-002-03 (ITP)]
Document Type
NOD - Notice of Determination
Received

Document Description
Caltrans proposes the existing Capell Creek bridge with a new bridge and install a series horizontal drains along Capell Creek as well as a geo-tech wall. The existing reinforced concrete bridge and steel girder bridge will be replaced with a pre-cast/pre-stressed l-girder bridge with cast in place/reinforced concrete bents on the existing alignment. A temporary detour bridge and associated road widening, install temporary access road to construct creek diversion, install horizontal drains, demolish existing bridge, remove creek diversion. Season 2: site preparation, install creek diversion system, construct bridge abutments and piers, construct bride deck and roadway approaches, shift traffic to proposed bridge, remove temporary detour bridge and remove creek diversion. Season 3; Site Restoration. The project is expected to result in incidental take of foothill yellow-legged frog (Rana boylii) a species listed as candidate threatened under CESA. The project is expected to cause the permanent loss of 0.010 acres of habitat for the Covered Species, and temporary loss of 0.524 acres of habitat for the Covered Species. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of the project implementation.

Contact Information
Robert Stanley
CDFW
2825 COrdelia Road, Suite 100
Fairfield, CA 94534

707-428-2093

Location

Cities
Napa
Counties
Napa
Cross Streets
SR 128 from PM 19.7 to 20.7
Zip
94558
State Highways
128

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
2825 Cordelia Road, Suite 100, Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No