Feather River Drainage Project (Lake or Streambed Alteration Agreement No. 1600-2017-0180-R2)

5 Documents in Project

Summary

SCH Number
2016022003
Lead Agency
California Department of Transportation, District 2
Document Title
Feather River Drainage Project (Lake or Streambed Alteration Agreement No. 1600-2017-0180-R2)
Document Type
NOD - Notice of Determination
Received
Posted
10/25/2017
Present Land Use
Caltrans ROW and federal land
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0180-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, State of CA Dept. of Transportation. Project is limited to the replacement of two existing culverts (Locations 10 and 11) and the installation of one new culvert (Location 14). The culverts will be installed or replaced by cutting the existing road, removing the old culvert, excavating a new trench if necessary placing the new culvert and repairing the cut roadway. Culvert replacement will be directly within existing culvert footprints. Cast-in-place or pre-cast concrete drop inlets will be installed in the area immediately around the opening of each culvert.

Contact Information

Name
Suzanne Gilmore
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Butte, Plumas
Cross Streets
SR 70
Zip
95965
Total Acres
6.24
Parcel #
Caltrans ROW and federal land
State Highways
SR 70
Waterways
North Fork Feather River
Township
22N
Range
5E
Section
6
Other Location Info
Pulga

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print