Feather River Drainage Project

5 Documents in Project

Summary

SCH Number
2016022003
Lead Agency
Caltrans 2 (Redding) (California Department of Transportation, District 2)
Document Title
Feather River Drainage Project
Document Type
NOD - Notice of Determination
Received
Posted
3/29/2016
Present Land Use
Caltrans ROW and federal land

Document Description
Caltrans proposes to conduct culvert work along SR 70 in Butte and Plumas Counties. The purpose of the proposed project is to repair and replace culverts in accordance with current requirements, as well as construct new drainage facilities where appropriate. Work would consist of the repair, replacement, upgrading, and/or installation of culverts and inlet/outlet treatments. Staging would occur within Caltrans right-of-way. The project would require permits from the U.S. Army Corps of Engineers (404), CDFW (1600), and the Regional Water Quality Control Board (401). Temporary Construction Easements would be required for work activities outside of Caltrans Right-of-Way.

Contact Information
Crhsi Quiney
California Department of Transportation, District 2
1657 Riverside Drive MS-30
Redding, CA 96001

Phone : (530) 225-2828

Location

Coordinates
39°47'07"N 121°27'02"W
Counties
Butte Plumas
Cross Streets
SR 70
Zip
95965
Total Acres
6.24
Parcel #
Caltrans ROW and federal land
State Highways
SR 70
Waterways
North Fork Feather River
Township
22N
Range
5E
Section
6
Other Location Info
Pulga

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
www.dot.ca.gov/dist3/departments/envinternet/envdoc.htm

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.