North Campus Open Space Restoration Project

11 Documents in Project

Summary

SCH Number
2016021103
Lead Agency
University of California, Santa Barbara
Document Title
North Campus Open Space Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
3/29/2016
Present Land Use
The UCSB 2010 Long Range Development Plan has applied a "Open Space" land use designation to the project site.
Document Description
The Santa Barbara Campus proposes to restore portions of the historic northern extent of the Devereux Slough primarily on the former golf course property, and would also restore portions of the South Parcel. Proposed restoration efforts would expand slough, wetland and transitional and upland habitats; provide public access and passive recreation amenities (trials and bridges); and promote educational opportunities. Restored areas would be revegetated with native species to create a diverse range of habitats that would connect to and expand important native habitats of the existing lower Devereux Slough and the surrounding Coal Oil Point Reserve. Restoration would be accomplished by excavating approx. 355,000 cubic yards of soil primarily from the golf course property and from approx.. 3 acres of the South Parcel, and by placing the excavated soil primarily on the South Parcel (from which it was excavated for Golf Course construction in 1965). To create a functional hydrologic connection between the restored estuary habitats on the project site and the lower Devereux Slough, the Project would remove a sheet pile water control structure (sill) and associated armoring from Devereux Creek at the Devereux Creek Bridge.

Contact Information

Name
Shari Hammond
Agency Name
University of California, Santa Barbara
Contact Types
Lead/Public Agency

Location

Cities
Goleta
Counties
Santa Barbara
Cross Streets
Storke Road and Whittier Drive
Zip
93106
Total Acres
136
Parcel #
073-090-062
State Highways
101, 217
Railways
UPRR
Airports
Santa Barbara Municipal
Schools
Isla Vista Elem.
Waterways
Goleta Sloguh, Devereaux Slough

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print