North Campus Open Space Restoration Project
11 Documents in Project
Summary
SCH Number
2016021103
Lead Agency
University of California, Santa Barbara
Document Title
North Campus Open Space Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
3/2/2021
Document Description
North Campus Open Space Public Access Project 2020157 The North Campus Open
Space (NCOS) is a large restoration project within a larger (652 acre) permanently protected coastal open space. WCB will fund several public access components. The parking lot will be renovated including ADA parking, bike path, and an automatic gate. Two overlooks will be constructed of decomposed granite (DG) and installed with benches. DG trails from the sidewalk to the trail head and visitor plaza, and an entry trail to the wetlands will be constructed. A post and cable fence will line the sidewalk, overlook, and trail to protect sensitive areas. The project will install a storage facility for an all-terrain wheelchair. A bioswale will be constructed to assist with drainage from the parking lot.
Contact Information
Name
John P. Donnelly
Agency Name
Department of Fish and Wildlife, Wildlife Conservation Board
Contact Types
Responsible Agency
Phone
Location
Cities
Goleta
Counties
Santa Barbara
Other Location Info
The North Campus Open Space (NCOS) site is located on the south coast in the City of Goleta, just north of Isla Vista, and 3 miles from the City of Santa Barbara. The restoration site is owned by the Regents of the University of California, Santa Barbara. The project is located in Santa Barbara County.
Notice of Determination
Approving Agency
Wildlife Conservation Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.