Class 2 Modification for Solar Turbines Inc. Hazardous Waste Post Closure Facility Permit

3 Documents in Project

Summary

SCH Number
2016021097
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Class 2 Modification for Solar Turbines Inc. Hazardous Waste Post Closure Facility Permit
Document Type
NOD - Notice of Determination
Received
Posted
12/9/2020
Present Land Use
Industrial
Document Description
The California Department of Toxic Substances Control (DTSC) adopted an Addendum to the previous Initial Study/Negative Declaration (IS/ND) and approved Class 2 Permit Modification for updates on the Water Quality Sampling and Analysis Plan. This permit modification is necessary for consistency with the Regional Water Quality Control Board Orders as well as the current DTSC-approved Water Quality Sampling and Analysis Plan for Corrective Actions for non-RCRA hazardous waste, pursuant to authority granted under California Health and Safety Code Chapter 6.5 and California Code of Regulations, Title 22, Division 4.5, Chapter 20.

Contact Information

Name
Rebecca De Pont
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Name
Agency Name
Solar Turbines Inc.
Contact Types
Project Applicant

Location

Cities
San Diego
Counties
San Diego
Zip
92101

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print