Interim Measures Work Plan and Post Closure Permit for Solar Turbines Incorporated Harbor Drive Facility

3 Documents in Project

Summary

SCH Number
2016021097
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Interim Measures Work Plan and Post Closure Permit for Solar Turbines Incorporated Harbor Drive Facility
Document Type
NOD - Notice of Determination
Received
Posted
5/10/2016
Present Land Use
Mixed Residential, Commercial, and industrial land use
Document Description
The proposed project is to (1) provide hydraulic control at the site's property boundary to prevent chemicals from migrating offsite, (2) conduct groundwater monitoring in accordance with post-closure requirements specified in CA Code of Regulations, title 22, division 4.5, chapter 14, article 6, and (3) maintain the integrity of the existing structures/covers of seven formerly closed hazardous waste management units.

Contact Information

Name
Chia Rin Yen
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
W. Laurel St. and W. Hawthorn
Zip
92705
Total Acres
27
Parcel #
760-007-2400
State Highways
5
Airports
SD Int'l Airport
Schools
Washington Elem.
Waterways
San Diego Bay
Township
16S
Range
3W
Section
30

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print