Lakeview Ranchos Mutual Water Company Water System Improvements
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016021040
- Lead Agency
- State Water Resources Control Board
- Document Title
- Lakeview Ranchos Mutual Water Company Water System Improvements
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/27/2017
- Present Land Use
- PLU - Residential/Zoning residential & limited agriculture - Kern River Valley Specific Plan
- Document Description
- The Lakeview Ranchos Mutual Water Company (LRMWC) proposes to construct improvements to its potable water supply system to address drinking water violations received from the SWRCB. The proposed improvements will take place at the LRMWC's existing storage tank site, existing well sites (Well No. 1, Well No. 2, Well No. 3, and Well No. 4), and at a proposed well site (Well No. 5), along the existing and proposed water transmission pipeline alignment.
- Contact Information
-
Bridget Binning
State Water Resources Control Board
Lead/Public Agency
1001 I Street, 17th Floor
Sacramento, CA 95812
Phone : (916) 449-5600
Location
- Coordinates
- 35°38'15.9"N 118°20'5.5"W
- Counties
- Kern
- Cross Streets
- Bull Run Road and Long Canyon Road
- Zip
- 93283
- State Highways
- 178
- Waterways
- South Fork River Valley Watershed
- Township
- 26S
- Range
- 34E
- Section
- 16
- Base
- SB
- Other Location Info
- Weldon
Notice of Determination
- Approving Agency
- SWRCB
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 1001 I Street, 17th Floor, Sacramento, CA 95814
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.