Lakeview Ranchos Mutual Water Company Water System Improvements
5 Documents in Project
Summary
SCH Number
2016021040
Lead Agency
State Water Resources Control Board
Document Title
Lakeview Ranchos Mutual Water Company Water System Improvements
Document Type
NOD - Notice of Determination
Received
Posted
8/16/2016
Present Land Use
PLU - Residential/Zoning residential & limited agriculture - Kern River Valley Specific Plan
Document Description
SWRCB Safe Drinking Water State Revolving Fund Program is providing funds for the project. The Lakeview Ranchos Mutual Water Company (LRMWC) proposes to construct improvements to its potable water supply system to address drinking water violations received from the SWRCB. The proposed improvements will take place at the LRMWC's storage tank site, existing well sites (Well No. 1, Well No. 2, Well No.3, and Well No.4), at a proposed well site (Well No. 5), and soil excavation; off-site disposal of approx. 2,600 CY of soil for the pipeline installation along a proposed water transmission pipeline alignment. All work will occur on privately-owned property as well as existing and proposed easements.
Contact Information
Name
Bridget Binning
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Kern
Cross Streets
Bull Run Road and Long Canyon Road
Zip
93283
State Highways
178
Waterways
South Fork River Valley Watershed
Township
26S
Range
34E
Section
16
Base
SB
Other Location Info
Weldon
Notice of Determination
Approving Agency
SWRCB
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.