Cardiff State Beach Living Shoreline Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016021029
- Lead Agency
- Parks and Recreation, Department of (California Department of Parks and Recreation)
- Document Title
- Cardiff State Beach Living Shoreline Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/19/2017
- Present Land Use
- Open Space
- Document Description
- Restoration of a dune system along 2,900 feet of Cardiff State Beach in the City of Encinitas, CA. The dune would serve as a natural seal-level rise (SLR) adaptation strategy and to protect a vulnerable segment of Coast Highway 101. The project would beneficially re-use 25,000 cy of export sand from the San Elijo Lagoon Restoration Project for dune construction. The dunes would be planted with native seed after construction. The project also entails the reconfiguration and burial of existing riprap, construction of a four-foot wide footpath along Coast Hwy 101 and 6 beach access points.
- Contact Information
-
Evyan Sloane
State Coastal Conservancy
1515 Clay St., 10th Floor
Oakland, CA 94612
Phone : (510) 286-4162
Location
- Coordinates
- 33°0'28.22"N 117°16'18.1"W
- Cities
- Encinitas
- Counties
- San Diego
- Cross Streets
- Between Hwy 101 and Chesterfield Dr. and Ocean Street
- Zip
- 92024
- Parcel #
- 2611710700
- State Highways
- S21
- Railways
- NCTD
- Schools
- Cardiff ES
- Waterways
- Pacific Ocean
- Township
- 13S
- Range
- 4W
- Section
- 27
Notice of Determination
- Approving Agency
- State Coastal Conservancy
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- http://www.parks.ca.gov/?page_id=983
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.