Red Top Conveyance Project Water Year 2016-2026 Transfer and Exchange
6 Documents in Project
Summary
SCH Number
2016021011
Lead Agency
Central California Irrigation District
(CCID)
Document Title
Red Top Conveyance Project Water Year 2016-2026 Transfer and Exchange
Document Type
NOD - Notice of Determination
Received
Posted
8/11/2016
Present Land Use
Vacant Land, River/ARE-40, AE20/AE, Agriculture
Document Description
The Project will convey the transferred and/or exchanged surface water from Central California Irrigation District's Poso Canal across the San Joaquin River (SJR) to areas in Western Madera County. The water will be conveyed to farmers on the eastside of the river and to future and existing grower recharge basins through existing pipeline and turnouts. The Project consist of a SJR crossing described as the Red Top Pipeline crossing. The pipeline will connect a new turnout at the Paso Canal, to existing pump stand on the other side of the SJR. The connecting pipeline will be approx. 452 feet in length and will be either be placed across the river using a jack and bore technique, or placed across the river using an open cut trench. The State Lands Commission action is an approval of a 10-year General Lease - Public Agency Use through August 8, 2026.
Contact Information
Name
Randy Collins
Agency Name
CA State Lands Commission
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Fresno, Madera
Cross Streets
Road 1 and Avenue 18 1/2
Total Acres
2
Parcel #
020-200-001 001-090-03T
Waterways
San Joaquin River
Township
11S
Range
13E
Section
2
Base
MDBM
Other Location Info
Dos Palos
Notice of Determination
Approving Agency
CA State Lands Commission
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No