Red Top Conveyance Project Water Year 2016-2026 Transfer and Exchange
6 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016021011
- Lead Agency
- Central California Irrigation District
- Document Title
- Red Top Conveyance Project Water Year 2016-2026 Transfer and Exchange
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/28/2016
- Present Land Use
- Vacant Land, River/ARE-40, AE20/AE, Agriculture
- Document Description
- To install a 36-inch single wall reinforced concrete pipe from a turnout in the Paso Canal across the San Joaquin River where it will connect to an existing pump station and conveyance facilities. The pipeline will be installed in an open trench through the channel and will be concrete encased under the San Joaquin River.
- Contact Information
-
James Herota
Central Valley Flood Protection Board
3310 El Camino Ave., Suite 170
Sacramento, CA 95821
Phone : (916) 574-0651
Location
- Coordinates
- 37°1'6.276"N 120°31'47.856"W
- Counties
- Fresno Madera
- Cross Streets
- Road 1 and Avenue 18 1/2
- Total Acres
- 2
- Parcel #
- 020-200-001 001-090-03T
- Waterways
- San Joaquin River
- Township
- 11S
- Range
- 13E
- Section
- 2
- Base
- MDBM
- Other Location Info
- Dos Palos
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3310 El Camino Ave., Suite 170, Sacramento, CA 95821
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.