Alviso Pump Station (Streambed Alteration Agreement no. 1600-2016-0163-R3)
3 Documents in Project
Summary
SCH Number
2016012064
Lead Agency
City of San Jose
Document Title
Alviso Pump Station (Streambed Alteration Agreement no. 1600-2016-0163-R3)
Document Type
NOD - Notice of Determination
Received
Posted
4/27/2017
Present Land Use
General Plan Designation: Mixed Use Neighborhood, Light Industrial, Open Space, Parklands, and Habitat
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0163-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of San Jose.
Project consists of the construction of a new outfall and related structures within the channel and banks of Alviso Slough. This will include partial bulkhead replacement, a new outfall pipe, a new discharge structure, and rock slope protection. A sheet-pile coffer dam will be installed and the construction area within will be dewatered.
Contact Information
Name
Kristin Garrison
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Jose
Counties
Santa Clara
Cross Streets
Gold & Catherine St
Zip
95002
Total Acres
2.50
Parcel #
015-02-004, 015-*01-025, 015-01-037
State Highways
US101, SR237
Railways
Caltrain, UPRR
Airports
SJ International
Schools
George Mayne ES
Waterways
Alviso Slough
Base
MDM
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.