Monte Bello Open Space Preserve Bridge Projects (Streambed Alteration Agreement No. 1600-2016-0160-R3)
3 Documents in Project
Summary
SCH Number
2016012050
Lead Agency
Midpeninsula Regional Open Space District
Document Title
Monte Bello Open Space Preserve Bridge Projects (Streambed Alteration Agreement No. 1600-2016-0160-R3)
Document Type
NOD - Notice of Determination
Received
Posted
8/24/2017
Present Land Use
Zoning Designation: Publicly Owned Conservation Land; General Plan designation: Other Public Open Lands
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0160-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Midpeninsula Regional Open Space District.
Site #1: The existing 24-foot long bridge will be replaced with a 50 foot long bridge and be placed at a higher elevation to reduce the potential for bridge failure during storm events (above 100 year flood elevation). A 120 foot long segment of existing trail will be rerouted to meet the new bridge elevation. Site #2: This site currently does not have a bridge at the trail crossing. A 50 foot long bridge will be constructed to be located above the 100 year flood elevation. The existing trail (20 feet on the east side of the bridge and 60 ft. on the west side of the bridge) will be re-routed to match the grade of the new bridge.
Contact Information
Name
Kristin Garrison
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Palo Alto
Counties
Santa Clara
Cross Streets
At two creek crossings along the Stevens Creek Nature Trail
Zip
94022
Total Acres
<1
Parcel #
35106025
State Highways
35
Waterways
Stevens Creek (SC), tributary creek to SC, & 8 others
Township
7S
Range
3W
Section
15
Base
MD
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No