CR 67 Br. Replacement Project over Branch Howard Slough Br. No:11C0015 to 11C0017 (EP 19472)
9 Documents in Project
Summary
SCH Number
2016012036
Lead Agency
Glenn County
Document Title
CR 67 Br. Replacement Project over Branch Howard Slough Br. No:11C0015 to 11C0017 (EP 19472)
Document Type
NOD - Notice of Determination
Received
Posted
1/29/2021
Document Description
To replace the existing single lane County Road 67 Bridge 11C-17 (Bridge 17). The new bridge will be 32.6 feet wide and 107.6 feet long, with two travel lanes and includes: a 4-span cast-in-place reinforced concrete slab bridge supported by 24-inch diameter piers and reinforced concrete abutments; widening of the approach roadways to match the proposed bridge geometry; hydroseeding the extent of the disturbed area to reduce embankment fill erosion.
Contact Information
Name
James Herota
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Glenn County
Contact Types
Project Applicant
Location
Cities
Afton
Counties
Glenn
Waterways
Butte Basin
Other Location Info
3.5 miles east of Afton, on County Rd. 67, in Area E of the Butte Basin, Glenn County.
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes