Foster City Levee Protection Planning and Improvements Project (CIP 301-657)

7 Documents in Project

Summary

SCH Number
2016012012
Lead Agency
City of Foster City
Document Title
Foster City Levee Protection Planning and Improvements Project (CIP 301-657)
Document Type
NOD - Notice of Determination
Received
Posted
4/8/2019
Document Description
The Project involves improvements to approximately 43,000 linear feet (8 miles) of an existing levee system surrounding the City of Foster City along the San Francisco Bayfront. The purpose of the Project is to provide flood protection in accordance with updated Federal Emergency Management Agency guidelines and retain FEMA accreditation for the City's existing levee system. The improved levee system will be designed to adapt to future sea-level rise while maintaining public access along the levee system and protections for sensitive species. Levee improvements would include a combination of three different levee types: 1) sheet pile floodwall, 2) earthen levee, 3) conventional floodwall. The State Lands Commission action is an approval of a 35-year General Lease - Public Agency Use through April 5, 2054.

Contact Information

Name
Jennifer Lucchesi
Agency Name
CA State Lands Commission
Contact Types
Lead/Public Agency

Location

Other Location Info
The Project area will be generally located within the footprint of the approximate 43,000 linear foot existing levee system that surrounds Foster City along the bayfront with a slight deviation from the existing levee system footprint.

Notice of Determination

Approving Agency
CA State Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print