Apple Road over Fruit Channel Bridge Replacement (Lake or Streambed Alteration Agreement No. 1600-2016-0051-R2)
3 Documents in Project
Summary
SCH Number
2016012010
Lead Agency
Sacramento County
Document Title
Apple Road over Fruit Channel Bridge Replacement (Lake or Streambed Alteration Agreement No. 1600-2016-0051-R2)
Document Type
NOD - Notice of Determination
Received
Posted
5/25/2016
Present Land Use
Agricultural residential land uses are adjacent to the project alignment
Document Description
The project is limited the replacement of the existing bridge on Apple Road over Fruit Channel. The existing structure is approx. 23 feet long and 27 feet wide, and consists of four arched corrugated metal pipes (CMP) that are 5 feet with width and 3 feet in height, topped with asphalt concrete. The existing approach roadway is approx. 20 feet wide. The roadway and bridge currently accommodate two travel lanes. The replacement bridge will consist of four 57 inch by 38 inch arched CMP culverts and the bridge length will be 24.6 feet. Rock slope protection (RSP) will be placed within an area approx. 75 feet long by 11 feet wide along the south side of Apple Road to prevent scour. A concrete cut-off wall four feet in depth will be constructed along the north side of Apple Road to prevent scour. The culverts will be constructed to match the flowline of the existing culverts. The roadway will be constructed to match the existing roadway profile.
Contact Information
Name
Tanya Sheya
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Sacramento
Cross Streets
Apple Road and Dillard Road
Zip
95693
Total Acres
0.58
Waterways
Fruit Channel; Cosumnes River
Township
7N
Range
7E
Base
MD
Other Location Info
Cosumnes
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.