Old Sacramento Riverfront Embarcadero and K Street Barge Repair (PB15-030) - Old Sacramento Infrastructure Project

3 Documents in Project

Summary

SCH Number
2016012005
Lead Agency
Sacramento, City of (City of Sacramento)
Document Title
Old Sacramento Riverfront Embarcadero and K Street Barge Repair (PB15-030) - Old Sacramento Infrastructure Project
Document Type
NOD - Notice of Determination
Received

Document Description
The project includes two phases with the 1st phase consisting of removing & replacing the existing boardwalk decking; replacing the existing wood fascia on the floodwall; repairing the existing barge, dock, stairs, & elevator; replacing lighting with new lighting system; removing the one-story addition to the south side of the Streamers Building; adding stairs to the elevated cantilevered sections of the Embarcadero; ADA improvements to the Embarcadero; replacing railroad ties & new concrete panels installed between the ties & tracks returned to original position; replacing existing railings; & installing wood overlays on the cantilevered sections that are not on a concrete deck. The 2nd phase includes removing a pier section at the north end of the project site; installing a new maintenance platform at the CA Pacific Streamers Building; & upgrading the bike path.

Contact Information
Scott Johnson
City of Sacramento
300 Richards Blvd., 3rd Floor
Sacramento, CA 95811

916-808-5842
srjohnson@cityofsacramento.org

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
I and Front Streets and L and Front Streets, along the east bank of the Sacramento River
Zip
95814
Total Acres
1.5
State Highways
I-5
Railways
State Historic, UPRR
Waterways
Sacramento River

Notice of Determination

Approving Agency
City of Sacramento
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
300 Richards Blvd., 3rd Floor, Sacramento, CA 95811

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
Yes