Santa Ana River Interceptor Rock Removal Project (Project No. 2-41-8)

2 Documents in Project

Summary

SCH Number
2016011050
Lead Agency
Orange County Sanitation District
Document Title
Santa Ana River Interceptor Rock Removal Project (Project No. 2-41-8)
Document Type
NOD - Notice of Determination
Received
Posted
4/28/2016
Present Land Use
Open Space (OS-General)/Open Space by Yorba Linda and Open Space/General Agriculture (A1) by County.
Document Description
The proposed project would remove rock material from the Santa Ana River channel downstream of the Green River Golf Club. As required by permit conditions, the project would remove temporary rock rip rap material that was placed between 2005 and 2011. Rock placed before 2005 would also be removed where practical. Minor smoothing of the river banks would be performed to restore their shape in areas where rock is removed. Site access would occur via existing unpaved temporary roads, most of which were used in the past to deposit the rock and access former OCSD manholes (which have now been abandoned). After removal work is completed, temporary access roads that led to past manholes would be scarified and hydro-seeded with a native plant mixed approve by the resource agencies to facilitate re-growth of vegetation.

Contact Information

Name
Daisy Covarrbuias
Agency Name
Orange County Sanitation District
Contact Types
Lead/Public Agency

Location

Cities
Anaheim, Yorba Linda
Counties
Orange
Cross Streets
Gypsum Canyon Road and E. La Palma Ave.
Zip
92887
State Highways
SR- 91
Railways
BNSF
Waterways
Santa Ana River
Township
3S
Range
8W
Section
34
Base
SBBM
Other Location Info
Corona

Notice of Determination

Approving Agency
Orange County Sanitation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print