Suncrest Dynamic Reactive Power Support Project

3 Documents in Project

Summary

SCH Number
2016011004
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Suncrest Dynamic Reactive Power Support Project
Document Type
NOD - Notice of Determination
Received
Posted
10/2/2018
Present Land Use
Undeveloped/Agriculture/Rural Land
Document Description
The project includes two primary components: (1) a Static Var Compensator (SVC) facility, and (2) an approx. one-mile-long 230 kilovolt transmission line connecting from the SVC to the existing Suncrest Substation. The SVC facility would produce and consume reactive power and would be approx. 6 acres in total size. The transmission line would be installed primarily underground beneath Bell Bluff Truck Trial road, with the last approx. 300 feet of the line transitioning aboveground via an 85 to 95 foot pole to connect with the existing substation.

Contact Information

Name
Robert Peterson
Agency Name
California Public Utilities Commission
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Bell Bluff Truck Trail, Japatul Valley Road
Zip
91901
Total Acres
12.2
Parcel #
52304000800, 5230301300, 1400
State Highways
79
Waterways
Sweetwater River, Taylor Creek, Japatul Creek
Township
16S
Range
3E
Section
3,4
Base
SB
Other Location Info
Alpine

Notice of Determination

Approving Agency
California Public Utilities Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.