Vision Systems
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016011002
- Lead Agency
- City of Santee
- Document Title
- Vision Systems
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/9/2016
- Present Land Use
- General Industrial
- Document Description
- CDFW is intending to execute a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code (# 1600-2016-0103-R5) to the project applicant, Hamann Construction. The project proposes replacing the existing culvert under Woodside Ave. with a culvert that is 22 feet longer to accommodate widening of that roadway, removing silt buildup and widening the channel, installing approx. 1,450 sq. ft. of riprap on the outside curve of the channel, installing a gravel driveway to provide maintenance access, installing riprap at the outfall of the culvert and at the outlet of the channel to the San Diego River, and installing pervious reinforcement mat along the bottom of the channel.
- Contact Information
-
Kelly Fisher
CDFW
Lead/Public Agency
3883 Ruffin Road
San Diego, CA 92123
Phone : (858) 636-3160
Location
- Coordinates
- 32°50'59"N 116°57'16"W
- Cities
- Santee
- Counties
- San Diego
- Cross Streets
- 11322 N. Woodside Ave. between Riverford Rd. and mission Park Place
- Zip
- 92071
- Total Acres
- 7.28
- Parcel #
- 381-170-66 -68
- State Highways
- SR-67
- Airports
- Gillespie Field
- Schools
- Hill Creek School
- Waterways
- San Diego River
- Township
- 15S
- Range
- 1W
- Section
- 23
- Base
- SB
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3883 Ruffin Road, San Diego, CA 92123
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.