Beard Ditch Pipeline Replacement Project

Summary

SCH Number
2015122076
Lead Agency
Modesto Irrigation District
Document Title
Beard Ditch Pipeline Replacement Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Creek bed and bank/General Agriculture, A-2-40/Agriculture
Document Description
The project is the replacement of an existing 15-inch irrigation water pipeline, which is a portion of an MID siphon crossing of Dry Creek. Scour of the bed of Dry Creek has exposed a portion of the existing siphon pipeline, which is elevated above the creek bed and exposed to potential further damage form high flows in the creek. The western portion of the siphon would be replaced with 300-foot section of 18-inch pipe just south of the existing siphon alignment. The project would stabilize the facility and preserve MID's ability to provide irrigation service to farmland adjacent to and north of the project.

Contact Information

Name
Chad Tienken
Agency Name
Modesto Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Waterford
Counties
Stanislaus
Cross Streets
Beard Road and Lone Oak Road
Zip
95386
Total Acres
<1
State Highways
132
Waterways
Dry Creek
Township
43S
Range
11E
Section
20,21
Base
MDBM

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 10 (DOT), California Native American Heritage Commission (NAHC), Department of Toxic Substances Control, Department of Water Resources, Office of Emergency Services, California, Resources Agency, State Water Resources Control Board, Division of Water Quality, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), Central Valley Flood Protection Board
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), Central Valley Flood Protection Board
Development Types
Other (Repalce Irrigation Pipeline)
Local Actions
Irrigation
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Public Services, Recreation, Schools/Universities, Solid Waste, Transportation, Vegetation, Wetland/Riparian

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print