Canal Road Bridge Replacement 0662-6R-4080 - CP#11-58

2 Documents in Project

Summary

SCH Number
2015122067
Lead Agency
Contra Costa County
Document Title
Canal Road Bridge Replacement 0662-6R-4080 - CP#11-58
Document Type
NOD - Notice of Determination
Received
Posted
2/9/2016
Present Land Use
Bridge, Roadway, Canal Access Roads, Government owned.

Document Description
The purpose of this project is to replace an existing bridge that carries Canal Road over the Contra Costa Canal. The project consists of bridge replacement; raising the roadway and bridge profile; reconstruction of the existing roadway; driveways, and access conforms; removal of an existing pedestrian bridge because those facilities will be incorporated into the new bridge, and accompanying utility relocation and right-of-way transactions. Tree and shrubbery removal and trimming will be necessary in support of the project. A full detour will be necessary. Emergency vehicles will be re-routed in some cases but access will be maintained.

Contact Information
Ave Brown
Contra Costa County
255 Glacier Avenue
Martinez, CA 94553

Phone : (925) 313-2311

Location

Coordinates
38°01'15"N 121°57'04"W
Counties
Contra Costa
Cross Streets
Canal Road and Virginia Costa
Zip
94565
Parcel #
097114016 097335022
State Highways
4
Railways
AT&SF and SP
Schools
Belair Elem.
Waterways
Contra Costa Canal
Township
2N
Range
1W
Base
MD
Other Location Info
Bay Point

Notice of Determination

Approving Agency
Contra Costa County
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
255 Glacier Dr, Martinez, CA 94553

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search